Material Acceptance tracking is a time intensive process that requires extensive coordination between the entire project team. The most basic approach requires:
All these steps are enough to create confusion and payment errors that go months without being caught. FACS simplifies this tedious and error prone process by:
Tagging items that require Material Acceptance when they are initially loaded into the project.
Automatically providing Field personnel with the correct checklist, which lists out the Acceptance criteria for each item as soon as the item is selected within an Inspectors Daily Report.
Monitoring Acceptance and preventing accidental overpayment on items that have not met the Acceptance criteria.
The right tools help projects run smoothly. Let FACS automate the time intensive process of tracking Material Acceptance on your next project and start enjoying smoother projects today. Schedule a Consultation below to learn more.